PHASES OF THE BUILD

Phase 1

Design / Engineering

2-3 Months

  • Initial Consult
  • Discuss project
  • Rough estimate
  • Design / Engineering fee
  • Dream up floorplan
  • Design Meetings
  • Build Contract
  • Plans / Site tests
  • Engineering
  • Permitting
  • Site Prep
  • Initial Consult
  • Discuss project
  • Rough estimate
  • Design / Engineering fee
  • Dream up floorplan
  • Design Meetings
  • Build Contract
  • Plans / Site tests
  • Engineering
  • Permitting
  • Site Prep

Phase 2

Initial Construction – Build Shell

3-4 Months

  • Site Inspection
  • Grading / tree work
  • Build Foundation
  • Building walls and roofs
  • Sheathing
  • Windows and Exterior Doors
  • Electrical Rough
  • Plumbing Rough
  • HVAC Rough
  • Insulation
  • Drywall
  • Site Inspection
  • Grading / tree work
  • Build Foundation
  • Building walls and roofs
  • Sheathing
  • Windows and Exterior Doors
  • Electrical Rough
  • Plumbing Rough
  • HVAC Rough
  • Insulation
  • Drywall

Phase 3

Home Finishes

2-3 Months

  • Siding
  • Tile
  • Interior Doors
  • Trim
  • Driveway
  • Kitchen
  • Custom Built ins
  • Paint
  • Light Fixtures
  • Plumbing Fixtures
  • Floors
  • Siding
  • Tile
  • Interior Doors
  • Trim
  • Driveway
  • Kitchen
  • Custom Built ins
  • Paint
  • Light Fixtures
  • Plumbing Fixtures
  • Floors

Phase 4

Move In Preperation

1 Month

  • Landscaping / Sod
  • Fence
  • Whole home Punch list
  • Final Inspections
  • Certificate of Occupancy
  • Final Home Cleaning
  • Move in day!!!
  • Landscaping / Sod
  • Fence
  • Whole home Punch list
  • Final Inspections
  • Certificate of Occupancy
  • Final Home Cleaning
  • Move in day!!!